This is a close up of the detail I've been doing on one of the cul-de-sacs in town. The lumberyard office will go at the end of the spur line. I hope the engineer doesn't accidentally send a car of plywood through the side of the building.
Along the back of the layout in front of the background painting there is about a half-inch strip that needs detailing. I've started working on that area also. In the next post, I'll pull back and give a moe overall shot.